We are proud to be a part of the innovative new project for the University of California, Berkeley and their College of Chemistry. Heathcock Hall is a new, 6 story structure fully built out to support research and development for the college. The building is outfitted for 5 floors of chemistry labs, along with office and classroom spaces to support education alongside research. Upon completion, the new structure will be tied into two existing College of Chemistry buildings, creating an integrated campus for their students, faculty, and researchers.
Pribuss has been involved from the very early days of this project. The integration to the two existing structures created many unique site challenges due to the proximity to these adjacent buildings. To build the new structure, there was significant “Make Ready” work to perform on this project. Pribuss performed relocations of main utilities that served the other College of Chemistry buildings, all with no down time. We also performed countless investigative surveys and additional work to ensure that these other buildings could continue all operations during construction.
The building is cut into a hillside, which created a unique approach to excavation. As the foundation was slowly and carefully dug in lifts, Pribuss always kept track of progress and ensured any necessary utility connections were accounted for during the excavation. Once prepared for the new foundation, we performed a significant amount of plumbing in the mat slab. Laboratory waste, sanitary waste, and storm drain were all precisely installed in the rebar cage, with no delays to concrete pours. Above all, these high-risk activities were performed safely.
Construction for the lab building consists of full building Laboratory Hot and Cold water systems and Laboratory Waste and Vent to support the labs. The building is being installed with a brand-new Reverse Osmosis-Deionized Water system, which will be housed on the 1st floor and serve all floors. Additional utilities include Lab Vacuum, Nitrogen, High Pressure Nitrogen, and Argon. Pribuss is also installing a new Clean Dry Air system, with sufficient compressor capacity to feed back into the adjacent chemistry buildings and provide additional Lab Air for their labs as well. Through programming, it is clear that flexibility is paramount to the College’s operations. We have installed a significant amount of “Specialty Gas” piping throughout the building, which will allow the lab users to hook up whatever gas is needed for their experiments. As the gasses are not currently assigned and could be any level of purity and corrosiveness, Specialty Gas piping has been installed in orbital welded high purity stainless steel tubing.
We look forward to the completion of Heathcock Hall in 2027, and for the building to support the College of Chemistry for years to come.
ARCHITECT
Perkins & Will
GENERAL CONTRACTOR
Hathaway Dinwiddie
OWNER
Samuel Merritt University