Samuel Merritt University City Center Oakland Campus

PROJECT

Our Plumbing and Fire Projection Divisions are currently completing the extensive core & shell and tenant improvement work for the new 10-story Samuel Merritt University campus, which includes offices, classrooms, laboratories, and a teaching hospital. This high-rise building, designed for both medical and educational purposes, required specialized systems to meet its diverse functional needs. Our Plumbing Division played a key role in the project, managing the installation of all medical and laboratory gas systems, alongside the conventional plumbing infrastructure. We implemented a top-tier heat pump water heater system for domestic hot water, prioritizing energy efficiency. Additionally, the scope included a siphonic roof drainage system, an innovative solution that reduces storm piping size and eliminates the need for slope, thereby simplifying coordination and avoiding the usual challenges associated with roof drainage, such as increased structural height and lowered ceilings. Concurrently, our Fire Protection Division was tasked with the design-build fire sprinkler and standpipe system, tailored to this high-rise building’s requirements. At over 170 feet tall, the structure necessitated the installation of a fire pump and an onsite secondary fire water storage tank to meet strict pressure and flow standards. The project’s tight schedule and complex coordination demands required our team to leverage advanced BIM techniques for managing the intricate network of structural steel and MEP systems. Our strategic approach to planning the permit and inspection processes ensured that all construction milestones were achieved on time, despite the project’s demanding nature.

ARCHITECT

Perkins & Will

GENERAL CONTRACTOR

Hathaway Dinwiddie

OWNER

Samuel Merritt University

error: Content is protected !!